Holder-2.0.1Today we finished the first version of the holder mechanism. Create
TestThe rubber bands help pull the mobile goal in stronger and because they are on an angle, they also pull it down so the hooks grab onto the goal right away. It seems to work well, but the goal needs to be centered, and in just the right position. We probably need to add a mechanical funnel to ensure the goal is centered. Also, the hooks are very small. It might be easiest to add another cylinder if we need to, but hopefully we don’t need to. Really, we won’t be able to tell how consistent it is until we practice driving with it. Conveyor-2.0.0Create
TestThe Lexan shroud did not work at all with the conveyor at 200, 400, and 600 rpm. Furthermore, it was very difficult to build, because drilling holes in the right places is difficult, and once it’s attached, it’s very hard to change. We think we should shift into a design that is more easy to modify. |